About the Project
KLK Kolb, a producer of semi-finished surfactant products, aimed to increase production capacity by 20% while simultaneously achieving significant energy savings. To explore the feasibility of these goals, they asked Vicoma to assess the possibilities and provide a clear roadmap.
Vicoma’s Role
To map out the objectives and requirements, Vicoma assigned an employee to work on-site several days a week. Over a three-month period, we gathered all relevant information. Our analysis revealed that achieving the two main goals required four distinct sub-projects. The first focused on examining and visualising the expansion of production capacity. The second addressed potential energy savings. Automation was the theme of the third sub-project, while the fourth comprehensively analysed the impact on logistical movements within the company.
Result
Our comprehensive analysis demonstrated that KLK Kolb could achieve a 20% production increase alongside an estimated 40% reduction in energy use. A detailed scope and cost estimate were documented, providing KLK Kolb with a solid foundation for informed decision-making and future investment.
Expertises
Markt
Peter and his team can tell you all about Consultancy.
Peter van Dijk
Commercial Manager, Rotterdam
Main question
AkzoNobel Coatings in Sassenheim faced the challenge of replacing pipes along an existing, congested pipe bridge with minimal downtime.
Result
Thanks to thorough preparation and clear communication, the pipe replacement was executed seamlessly with minimal disruption.
Accompanied by
Location
Sassenheim