HVC Geothermal energy project: Quality control and site supervision

About the Project

”A partner in the energy transition and in making waste management more sustainable”, that’s how HVC describes itself. As a specialist in energy and reuse, HVC supports municipalities and water authorities.

A strong example of this is the sustainability of greenhouse horticulture through the connection of the Aardwarmte Maasdijk project to a local heat network. The cultivation of flowers, plants, vegetables, and fruit requires a great deal of heat. Growers often rely on natural gas in their greenhouses. In Maasdijk, several initiatives have already been launched to make this heat supply more sustainable by using geothermal energy.

Extracting geothermal energy requires two wells; a so-called doublet. Hot water is pumped up through the production well. The heat from this water is extracted using heat exchangers and transferred into a local heating network. The cooled water is then returned underground via the injection well.

As the salt content of groundwater is around five times higher than that of seawater, it is essential to use plastic piping for a geothermal network.

For the construction of three geothermal doublets, Aardwarmte Maasdijk partnered with HVC; and HVC in turn called on Vicoma’s expertise.

Vicoma’s Role

Our main task was piping engineering; but we did more than that. We carried out quality control on the design for the geothermal project and ensured consistency between the contractor’s isometric drawings and the actual piping being installed.

By closely monitoring progress throughout the execution phase, we kept the client fully informed on how the project was advancing at every stage.

Result

A one-hundred-per-cent match between the design and the contractor’s execution. The pipes are in place, and the geothermal station is up and running.

Another strong contribution from Vicoma towards a more sustainable future.

Expertises

Piping & Mechanical

Markt

Energy & Circularity
A bald man with glasses and a beard is wearing a suit and smiling at the camera.

Pim and his team can tell you all about Civil & Structural Engineering.

Pim Pieter Bontjer

Commercial Manager, Groningen

Main question

Reducing the leaching period of toxic substances from twenty years to five years.

Result

One hundred percent alignment between the design and the contractor’s execution. The pipelines have been connected, and the geothermal energy station is operational.

Accompanied by

Location

Maasdijk

Various projects completed

Our consulting and engineering firm works with a wide range of clients on single- and multidisciplinary projects, taking a pragmatic and flexible approach.

Read all projects

“Tata Steel: Working together on a reliable and future-proof installation!”

In collaboration with Tata Steel Nederland, a dual pipeline route comprising the North and South pipelines was replaced over a total length of more than 330 metres. The project required…

Read all about it here

Together, we offer a wide range of expertise

At Vicoma, we bring together a wide range of expertise, from engineering to project management, enabling us to tackle complex technical challenges in a comprehensive and well-considered manner.