HES Botlek Tank Terminal: Expansion of 25 kV connection

About the Project

HES Botlek Tank Terminal planned to expand by adding two tank pits housing eighteen tanks. To accommodate this growth, the existing 25 kV installation required upgrading. As this was not feasible within the current substation, the 25 kV connection had to be reinforced in collaboration with the grid operator. HES commissioned us to carry out the basic engineering for the electrical systems.

Vicoma’s Role

We prepared the specifications for the 25 kV switchgear and the three-winding transformers.
For the implementation phase, we developed a comprehensive electrical specification detailing the installation of the new 25 kV switchgear and the cabling and connection works for the transformers. We also documented the transfer of the existing transformers to the new switchgear. Throughout the project, we managed all coordination with the grid operator, relieving HES of this significant responsibility.

Result

The new substation now features fully redundant 25 kV switchgear. Thanks to our carefully devised transfer plan, the transition proceeded smoothly, and the installation was successfully commissioned by HES Botlek Tank Terminal. Together, we look back on a successful project.

HES Botlek

Expertises

Electrical Engineering

Markt

Tank Terminals
A smiling man in glasses and a suit poses for a professional portrait.

Want to know more about this project? Peter and his team can tell you all about it.

Peter van Dijk

Commercial Manager, Rotterdam

Main question

HES Botlek Tank Terminal planned to expand by adding two tank pits housing eighteen tanks.

Result

The new substation now features fully redundant 25 kV switchgear.

Accompanied by

Vicoma Rotterdam

Location

Tilburg

Various projects completed

Our consulting and engineering firm works with a wide range of clients on single- and multidisciplinary projects, taking a pragmatic and flexible approach.

Read all projects

“Tata Steel: How do you safely empty a 45-tonne container inside an existing facility?”

How do you safely empty a 45-tonne bin inside an existing facility? For Tata Steel IJmuiden, Vicoma provided the basic engineering for two new tipping frames.

Read all about it here

Together, we offer a wide range of expertise

At Vicoma, we bring together a wide range of expertise, from engineering to project management, enabling us to tackle complex technical challenges in a comprehensive and well-considered manner.