Piping & MechanicalHeavy industry

Bluewater Energy Services: Vicoma on the North Sea

About the Project

A Floating Production Storage and Offloading installation (FPSO) is essentially a complete oil production facility at sea. Vicoma played a key role in the conversion of the FPSO Aoka Mizu on behalf of Bluewater Energy Services. This vessel extracts oil from the Lancaster field in the North Sea for Hurricane Energy.

The project involved extensive modifications to the turret (the vessel’s pivot point) and multiple topside skids (structural frames). These changes needed to meet the production requirements, operational conditions, and strict regulations of the offshore extraction site.

Vicoma’s Role

Vicoma took charge of designing and installing the piping systems connecting the buoy to the topside skids. The challenge was to fit a large volume of piping, including large-diameter pipes with complex 3D-radius bends, into a very confined space. We also prioritised accessibility, safety, and ease of maintenance in our design solutions.

Result

The Aoka Mizu was successfully converted at Dubai Drydocks, and oil production off the west coast of the Shetland Islands is now underway.

Expertises

Piping & Mechanical

Markt

Heavy industry
A man with curly hair and a beard wearing a dark sweater smiles against a neutral background.

Arjan and his team can tell you all about .

Arjan Exel

Commercial Manager, Velsen

Main question

A Floating Production Storage and Offloading installation (FPSO) is essentially a complete oil production facility at sea.

Result

The Aoka Mizu was successfully converted at Dubai Drydocks, and oil production off the west coast of the Shetland Islands is now underway.

Accompanied by

Location

North Sea

Various projects completed

Our consulting and engineering firm works with a wide range of clients on single- and multidisciplinary projects, taking a pragmatic and flexible approach.

Read all projects

“Tata Steel: Working together on a reliable and future-proof installation!”

In collaboration with Tata Steel Nederland, a dual pipeline route comprising the North and South pipelines was replaced over a total length of more than 330 metres. The project required…

Read all about it here

Together, we offer a wide range of expertise

At Vicoma, we bring together a wide range of expertise, from engineering to project management, enabling us to tackle complex technical challenges in a comprehensive and well-considered manner.