Attero: Turnaround time for toxic leaching drastically reduced

About the Project

Twenty years!; that’s how long it typically takes for toxic substances to leach from waste at Attero. The waste processor believed this period could be significantly shortened. Vicoma was engaged with the ambitious goal of reducing this timeframe to just five years. The concept was that spraying the waste with warm water would accelerate the process. To test this theory, the landfill site in Bergen op Zoom was established as a pilot location.

In this experimental remediation process, warm water plays a pivotal role. The contaminated water, known as leachate, which percolates through the waste, is collected and treated in a water treatment plant to make it suitable for reuse. The electricity required is sustainably generated via a Combined Heat and Power (CHP) installation, and the gas needed is produced from Attero’s own digestion process.

Vicoma’s Role

Vicoma made a significant contribution to the highly environmentally friendly design of the entire process and provided support across several areas.

For example, on our advice, an existing engine was modified for use as a gas engine. Vicoma also offered input on the generator’s power supply, high-voltage protection systems, the use of heat exchangers, and the integration of surplus energy feeding back into the grid.

Result

Should the process at Bergen op Zoom perform as anticipated, it will set a new industry standard. Waste processor Attero plans to roll out this process to other landfill sites as well.

Expertises

Electrical EngineeringInstrumentationProject Management

Markt

Energy & Circularity
A bald man with glasses and a beard is wearing a suit and smiling at the camera.

Pim and his team can tell you all about Civil & Structural Engineering.

Pim Pieter Bontjer

Commercial Manager, Groningen

Main question

Reducing the leaching period of toxic substances from twenty years to five years.

Result

An existing engine was adapted for use as a gas engine based on our recommendations. Vicoma also advised on the generator’s power supply, high-voltage protection, the use of heat exchangers, and the process for feeding surplus energy back into the grid.

Accompanied by

Location

Bergen op Zoom

Various projects completed

Our consulting and engineering firm works with a wide range of clients on single- and multidisciplinary projects, taking a pragmatic and flexible approach.

Read all projects

“Tata Steel: Working together on a reliable and future-proof installation!”

In collaboration with Tata Steel Nederland, a dual pipeline route comprising the North and South pipelines was replaced over a total length of more than 330 metres. The project required…

Read all about it here

Together, we offer a wide range of expertise

At Vicoma, we bring together a wide range of expertise, from engineering to project management, enabling us to tackle complex technical challenges in a comprehensive and well-considered manner.